IFS Progress Logistics
IFS Progress Logistics 2 configuration
The following different levels can be chosen in the configuration step:
- Basic
- Intermediate
Action plan
Please note
Not all fields of the action plan are mandatory in case of a B scoring
Result
The IFS Progress main assessment result and possible action (in case of follow up to achieve the aimed assessed level) are shown in the first line of the result tab.
Additionally, possible results according to each individual level (basic and intermediate level) are shown separately in stratified details in the lines below.
Report and letter of confirmation
The wording in AXP Neo addresses IFS Standards and Programs.
Therefore, the IFS Progress Program shall always be the reference indicating proper applicability and needed completion of the information for report and letter of confirmation.
