Skip to main content

IFS Progress Logistics

IFS Progress Logistics 2 configuration​

The following different levels can be chosen in the configuration step:

  • Basic
  • Intermediate

Action plan​

Please note

Not all fields of the action plan are mandatory in case of a B scoring

Result​

The IFS Progress main assessment result and possible action (in case of follow up to achieve the aimed assessed level) are shown in the first line of the result tab.

Additionally, possible results according to each individual level (basic and intermediate level) are shown separately in stratified details in the lines below.

Report and letter of confirmation​

The wording in AXP Neo addresses IFS Standards and Programs.
Therefore, the IFS Progress Program shall always be the reference indicating proper applicability and needed completion of the information for report and letter of confirmation.